Welcome to Yunlong Liu's Homepage: http://www.jasonyunlong.com/

[Home] [Chinese Version] [Experiences] [Education] [Projects] [Publication] [Links]


Engineering Projects

  • 2020 - 2023: Sound Transit West Seattle and Ballard Link Extension Project (WSBLE), Seattle, USA. Client: Sound Transit, WA, USA.
  • 2019 - 2020: SR 520 Portage Bridge-Ronaoke Lid Ventilation design, Seattle, USA. Client: WSDOT, WA, USA.
  • 2019 - 2020: Silicon Valley Transit Authority (VTA), BART (WP - Diridon Arena - San Jose downtown - Alum Rock - EP) tunnel ventilation design and review, California, USA. Client: BART, California, USA.
  • April - December 2019: Texas DOT, Houston Highway I-45/I-69 tunnel ventilation concept design, - a design and analysis of the Request for Proposal (RFP) design. Client: Texas DOT, USA.
  • 2020 - 2023: Review of Tunnel ventilation and Fire emergency evacuation solution for SR 520 Montlake Bridge Lid, Seattle, USA. Client: WSDOT, WA, USA.
  • 2018 - present: Detailed Design of Ventilation, Fire & Life Safety for Melbourne Metro Tunnels and Stations (Arden, Parkville, CBD North, CBD South and Domain). Client: Melbourne Metro Rail Authority, Australia.
  • 2018: Review and certification of fire and life safety design for the Riyadh Metro Line 1 and Line 2 stations. Client: ADA, Kingdom of Saudia Arabia.
  • September - October, 2016: SES and CFD analysis of fire life safety for the Forrestfield Airport Link tunnel, Perth, Western Australia. Client: Geodata, Public Transportation Authority WA, Australia.
  • August - September 2016: Tender design and CFD analysis for the smoke exhaust system of Melbourne Western Distributor road tunnel. Melbourne, Victoria, Australia. Client: CPB John Holland on behalf of Victoria state government, Australia.
  • July - August 2016: Sydney WestConnex M4-East road tunnel fire and life safety analysis, Sydney, NSW, Australia Client: New South Wales State government, Australia.
  • May-July, 2016: Sydney NorthConnex M1-M2 Road Tunnel, Phase I Project, NSW, Australia. Tunnel Fire and Life Safety analysis. Client: New South Wales State government, Australia.
  • June - July, 2016: Perth - Butler Tunnel fire and life safety analysis-Tunnel 2/4 and Tunnel 5 for the emergency ventilation analysis and report. Client: Public Transportation Authority, Western Australia.
  • July - August 2015: Preliminary ventilation design for the RailRunner underpass tunnel crossing I-95 in Florida, USA. Client: FDOT, USA.
  • April - June 2015: The CFD Analysis of the Casey Overpass Forest Hills Commuter Station Fire Life Safety System, MA, USA. Client: MassDOT, USA.
  • April - May 2014: Structural fire safety analysis of Presidio North Bound Battery Tunnel, CA, USA. Client: Golden Link Concessionaire, USA.
  • February 2014: Boston South Station Expansion Project - Ventilation and Fire Safety Engineering, Boston, MA, USA.Client: MassDOT, USA.
  • January 2014: Independent opinion of Passive Fire Protection (PFP) design for Railway Bosphorus Tube Crossing, Tunnels and Stations, Istanbul, Turkey, istanbul, Turkey. Client: Hill International/Taisei GN JV.
  • December 2013 - January 2014: Review of ventilation and water mist fire suppression design for the Queens Midtown Tunnel rehabilitation, New York, USA. Client: Triborough Bridge and Tunnel Authority (TBTA), MA, USA.
  • May - June 2013: Structural fire safety thermal analysis and occupants egress analysis for the Tunnel at Fort Lauderdale-Hollywood Intl Airport, Florida, USA. Client: City of Fort Lauderdale, FL, USA.
  • January - June, 2013: Pre-award ventilation and fire safety concept design for Regional Connector Transit Corridor Project - 7th/Metro Center Station, 2nd/Hope St Station, 2nd/Broadway Station, 1st/Central Station and the associated tunnels in Los Angeles, USA. Client: Los Angeles County Metropolitan Transportation Authority (Metro), USA.
  • January - March, 2013: San Francisco Bay Area Rapid Transit (BART) - Warm Springs Extension Line Railway Station Ventilation, California, USA. Client: BART, CA, USA.
  • November 2012 - December 2013: Independent Verification Analysis for the Istanbul Strait Road Tube Crossing Project (ISRTCP) - Tunnel ventilation and fire safety, istanbul, Turkey. Client: Ministry of Transportation, Republic of Turkey.
  • November - December 2012: Independent review of the I-90 Two Way Transit and HOV - CFD Modelling Analysis (for Mt Baker Ridge Tunnel and Mercer Island Tunnel), Seattle, USA. Client: Washington State Department of Transportation, USA.
  • November - December 2012: Preliminary Analysis of Emission Rate and Air Demand for the Chicago 103rd Bus Maintenance Facility, IL, USA. Client: Chicago Transportation Authority (CTA), USA.
  • October 2012: Honolulu Rail Transit project (HRTP) maintenance & Storage Facility Atrium fire ventilation system design, HI, USA. Client: Honolulu Authority for Rapid Transportation, HI,USA.
  • September 2011 - November 2012: Detailed design of Seattle Alaskan Way Viaduct Replacement Program SR99 road tunnel ventilation and fire engineering, Seattle, USA. Client: Washington State Department of Transportation (WSDOT), WA, USA.
  • January - April 2012: Pre-award concept design of 11km long Evergreen Line Light Rail Tunnel, BC, Canada. Client: Province of British Columbia, Canada.
  • August, 2011: Sydney International Airport Terminal T1 - Emirate Lounge Expansion Fire Engineering Design, Sydney, Australia. Client: Sydney Airport Corporation, Australia.
  • July 2011: Structural Fire Engineering Assessment of Banora Point Land Bridge, NSW, Australia. Client: SMEC, Australia.
  • May - September, 2011: Detailed design of Perth Railway Station and the associated tunnels (Fremantle Line and Joondalup line). Client: GHD & the Perth City Link Rail Alliance, Western Australia.
  • 2010-2010: Tender design of Waterview Connection Tunnels. Client: New Zealand Transport Agency (NZTA), New Zealand.
  • 2010-2010: Detailed ventilation design of Victoria Park Tunnels. Client: New Zealand Transport Agency (NZTA), New Zealand.
  • 2009-2010: Concept design of Sydney Western Metro - Fire Life Safety for SOP Station. Client: Transport Infrastructure Development Corporation. New South Wales Government, Australia.
  • 2008-2010: Detailed design of fire & life safety system for the Brisbane Airport Link Tunnel. Client: Thiess & John Holland JV, BrisConnections, Australia.
  • 2008-2009: Assessment of the fire safety system for the proposed North Busway Tunnel. Client: Thiess & John Holland JV, BrisConnections, Australia.
  • 2007-2008: Design of Natural Ventilation System for the New Lynn Underground Railway Station. Client: New Zealand Transport Agency (NZTA), New Zealand
  • Apr - August 2007: Fire engineering report for Fairview Aged Care Facility, Moree. Client: Paynter Architect Pty Ltd, NSW, Australia
  • 2006-2007: Ventilation design for a semi-underground Car Park. Client: George Floth Ltd, Australia
  • Mar-May 2007: Fire Safety assessment for the Warehouse at 12 Barcoo St, Roseville, NSW. Client: Maitcorp Pty Ltd, Australia
  • Apr-Sep 2007: Ventilation and Fire Engineering assessment for Reliance Rail Maintenance Facility. Client: John Holland Pty Ltd, Australia
  • 2005-2006: Ventilation, fire and smoke management for Shenzhen Metro Tunnel, Line 4, Phase II Project. Client: Meinhardt, Hong Kong, China
  • 2005-2005: CFD aided fire safety assessment for Westfield shopping centre in Parramatta. Client: Westfield, Australia
  • 2001-2003: Design design of a particle-free operating theatre. Client: Meierhans AG, Zurich, Switzerland

Research Projects

  • 2005-2006: Design fires for apartment buildings, Funding: CSIRO, Australia and BRANZ, New Zealand
  • 2003-2005: Investigation of the water mist fire control of a train carriage, Funding: CSIRO, Australia
  • 2003-2005: CFD assessment of fire and smoke control of Sydney Harbour Tunnel, Funding: CSIRO, Australia
  • 2001-2003: Investigation of the ADMECO lamps and laminar flow ventilation of an operating room, Funding: ADMECO AG, Switzerland
  • 2001-2003: CFD modelling of fire smoke growth in an enclosure, Funding: Swiss Federal Institute of Technology, Zurich, Switzerland
  • 2000-2001: VLES / TRANS for Turbulent Shear Flows, Funding: Delft University of Technology, Netherlands
  • 1999-2000: Study of Turbulent Fluid flow Mechanism in a Hydrocyclone, Funding: Natural Science Foundation of Shandong, China
  • 1997-2000: Numerical Study of Oil Water Separation by a Hydrocyclone, Funding: China National Petroleum & Natural Gas Corp. (China National Key Project)
  • 1994-1997: Active Thermal Control of Manned Space Station, Funding: China National Defense Science and Technology Committee (China National High Technology 863 Key Project).
  • 1996-1998: Similitude Study of Flow and Heat Transfer in a Spacecraft Cabin, Funding: China National Natural Science Foundation (No.596866003)
  • 1997-1997: Visualization Study of flow in the Cabin of 10-ton Space Station Lab, Funding: China National Space Science Corporation
  • 1992-1992: Feasibility Study of East China Offshore Oil & Gas Pipeline Design, Funding: East China Offshore Petroleum Company
  • 1991-1994: Study of New Metallurgy Treatment Technology after Oil Pipeline Weld to Prevent Corrosion of Inner Pipe Surface, Funding: China National Petroleum & Natural Gas Corp. (China National Key Project)
  • 1991-1994: Study of Oil Pipeline Heat transfer Coefficient, Funding: China Petroleum Design & Research Company.
  • 1990-1992: Study of Oil and Sand Separation Technology, Funding: China Nanyan Petroleum Company.
  • 1987-1990: Study of Shutdown and Startup of non-Newtonian fluids or Oil Pipeline, Funding: China National Offshore Petroleum Company. (China National Key Project)

[Home] [Chinese Version] [Experiences] [Education] [Projects] [Publication] [LinkedIn]